The square at the exit from the metro serves as a transport hub. Organization of the area before the improvement did not meet the needs of all groups: a large parking lot occupied quite a big territory and was empty, while the pedestrian zone was organized ineffectively.

The project provided for separation of pedestrian and traffic flows, organization of new places for recreation, as well as landscaping of the territory to improve the environment and sound insulation. In total, about 100 trees and more than 7,000 shrubs have been planted. Plants are matched in such a way that the foliage or buds become red or burgundy at different times of the year. The architecture of the square takes into account not only permanent installations, but also temporary events such as weekend fairs, city holidays, festivals. Also, the project considers the historical layout and visually highlights the direction of the Ulitsa 1905 Goda street with to the paving pattern.
The square at the exit from the metro serves as a transport hub. Organization of the area before the improvement did not meet the needs of all groups: a large parking lot occupied quite a big territory and was empty, while the pedestrian zone was organized ineffectively.

The project provided for separation of pedestrian and traffic flows, organization of new places for recreation, as well as landscaping of the territory to improve the environment and sound insulation. In total, about 100 trees and more than 7,000 shrubs have been planted. Plants are matched in such a way that the foliage or buds become red or burgundy at different times of the year. The architecture of the square takes into account not only permanent installations, but also temporary events such as weekend fairs, city holidays, festivals. Also, the project considers the historical layout and visually highlights the direction of the Ulitsa 1905 Goda street with to the paving pattern.

Address
Moscow, Central Administrative Okrug, Presnensky District

Function
Square

Area
4,75 hectares

Release
2019

Project
2017-2018

Type of works
Conception, project documentation, engineering documentation, field supervision

Client
State Public Institution Major Building Maintance DRK of Moscow
Facts
The square at the exit from the metro serves as a transport hub. Organization of the area before the improvement did not meet the needs of all groups: a large parking lot occupied quite a big territory and was empty, while the pedestrian zone was organized ineffectively.

The project provided for separation of pedestrian and traffic flows, organization of new places for recreation, as well as landscaping of the territory to improve the environment and sound insulation. In total, about 100 trees and more than 7,000 shrubs have been planted. Plants are matched in such a way that the foliage or buds become red or burgundy at different times of the year. The architecture of the square takes into account not only permanent installations, but also temporary events such as weekend fairs, city holidays, festivals. Also, the project considers the historical layout and visually highlights the direction of the Ulitsa 1905 Goda street with to the paving pattern.

Main Architect
Olga Makarenko

Construction Director Deputy
Vasily Anisimov

Architects
Matvey Bogdanov, Julia Plakhina, Ekaterina Pekshina

Construction Engineer
Sergey Puzyrevsky

Engineers
Zoya Kotova, Denis Perevezentsev, Dmitry Goncharov, Irina Kupriyanova, Aleksandr Druzin
Authors
The square at the exit from the metro serves as a transport hub. Organization of the area before the improvement did not meet the needs of all groups: a large parking lot occupied quite a big territory and was empty, while the pedestrian zone was organized ineffectively.

The project provided for separation of pedestrian and traffic flows, organization of new places for recreation, as well as landscaping of the territory to improve the environment and sound insulation. In total, about 100 trees and more than 7,000 shrubs have been planted. Plants are matched in such a way that the foliage or buds become red or burgundy at different times of the year. The architecture of the square takes into account not only permanent installations, but also temporary events such as weekend fairs, city holidays, festivals. Also, the project considers the historical layout and visually highlights the direction of the Ulitsa 1905 Goda street with to the paving pattern.

2018
MOS.RU

The result of the improvement: how the squares near the metro station became public spaces

2019
Vilage.ru
Blooming square near the metro station "Ulitsa 1905 Goda"